Riverbend Advisors

Riverbend Advisors

Menu

  • Home
  • Recent Posts
  • SI Timeline
  • About

Clean Energy

You are here: Riverbend Advisors > Clean Energy

2 600kW wind turbines installed at MWRA Deer Island Facility

2 600kW wind turbines were installed at the Massachusetts Water Resources Authority’s Deer Island facility in August, 2009.  The 2 turbines are expected to generate 2 million kWh of electricity each year,  a savings of about $250,000 to the MWRA

Michael Greis November 30, 2009March 9, 2010 Massachusetts, Water, Wind Read more

1.5 MW Turbine installed at Massachusetts Military Reservation

A 1.5 MW Fuhrlander FL-1500 wind turbine was dedicated at the Massachusetts Military Reservation on Cape Cod in early November, 2009.  It is the 2nd largest wind turbine installed in Massachusetts, and the largest installed since 2007.   (A 1.65 MW

Michael Greis November 15, 2009March 2, 2010 Massachusetts, Wind Read more
  • Next »

Recent Items of Interest

2511402 F6X6F522 recent 1 https://www.riverbendadvisors.com/blog/wp-content/uploads/2019/08/site-resource-list-widget-v3.csl 50 ”date” 1 title https://www.riverbendadvisors.com/blog/wp-content/plugins/zotpress/
Copyright © 2026 Riverbend Advisors All rights reserved.Theme: Spacious Pro by ThemeGrill. Powered by: WordPress